NewNiceMrMe Posted September 2, 2011 Author Report Share Posted September 2, 2011 Ordered from CCS..only to receive an email saying they don't have the 64oz in that I ordered. I can have 16oz or a gallon. I reckon I'll just try to smaller size to begin with in that case. Link to comment Share on other sites More sharing options...
Mac Posted September 2, 2011 Report Share Posted September 2, 2011 What is the difference between washing down and drying down?I'm going to look for the motivation to properly shampoo, clay and wax the M3 in the coming weeks but dear god ... it takes so bloody long! I'll be useless at canoeing after that! I've done it once, and it took me about 5 hours. Never again, I'll be sub-contracting. Link to comment Share on other sites More sharing options...
Andrew Posted September 2, 2011 Report Share Posted September 2, 2011 Trouble with sub-contracting is that the sub-contractors seem to be ever so expensive. 5 hours you say, I'll need to check the forecast carefully to find a 5 hour good weather window in Scotland. Link to comment Share on other sites More sharing options...
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in
Sign In Now